Performance Measure
Agency
Measure Name
Tonnage of all material placed on permitted saltwater fishing artificial reef sites per year
Measure Last Modified
Aug 24 2018 10:47
Measure Last Published
Aug 15 2019 12:28
Measure Status
Active
Data Source and Calculation
The data will come from yearly agency reef construction and augmentation records of materials placed on reef sites. A running average of work done from 1993-2005, excluding 2002, an abnormally high tonnage year, had previously served as the baseline, and the agency worked diligently to achieve this target of 6,384 tons per year. However, with the state of the economy, the high price available for recycled concrete and the lack of available concrete for donation to the agency Reef Program, which had been the bedrock of the program, the target amount is being revised downward. Each calendar year the tonnage placed on all reef sites during the past year will be totaled. The agency's goal will be to place an amount of tonnage, each calendar year, that equals or exceeds the tonnage placed in the last 2 calendar years.
Enterprise Priorities and Strategies
Enterprise InitiativeEnterprise PriorityEnterprise Strategy
Associated Service Areas
SA CodeSA Name
50506Artificial Reef Construction
Measure ID40250506.001.001
Measure ClassOther Agency
Measure TypeOutput
Year TypeCalendar
Preferred TrendStable
FrequencyAnnually
Statistical UnitTonnage
Baseline and Targets
Target NameDateResultNote
Baseline21532015 to 2016 two year average (2017 not used for most recent average since it was an abnormally high year)
Short Target 202006/30/20202153tons of material placed on artificial reef sites
Long Target 202206/30/20202153tons of material placed on artificial reef sites
Measure Results
YearResultExplanatory Note
1993475.00This measure includes activity covering an entire calendar year.
1994950.00This measure includes activity covering an entire calendar year.
19951,595.00This measure includes activity covering an entire calendar year.
199622,324.00This measure includes activity covering an entire calendar year.
19975,200.00This measure includes activity covering an entire calendar year.
19988,710.00This measure includes activity covering an entire calendar year.
1999978.40This measure includes activity covering an entire calendar year.
200013,230.00This measure includes activity covering an entire calendar year.
200118,078.00This measure includes activity covering an entire calendar year.
2002128,000.00This measure includes activity covering an entire calendar year.
200337,398.00This measure includes activity covering an entire calendar year.
200435,820.00This measure includes activity covering an entire calendar year.
20058,464.00This measure includes activity covering an entire calendar year.
200641,076.00This measure includes activity covering an entire calendar year.
200726,168.00This measure includes activity covering an entire calendar year.
200818,084.00This measure includes activity covering an entire calendar year.
200913,346.00This measure includes activity covering an entire calendar year.
20104,588.00This measure includes activity covering an entire calendar year.
20115,328.00This measure includes activity covering an entire calendar year and 2011 data reflects all artificial reef deployment efforts for that calendar year.
20123,361.00Data for 2012 agency artificial reef augmentation (in tons) will not be available until late 2012. This allows the program to take credit for all deployments that take place in calendar year 2012.
20134,037.00Total tonnage is calculated for an entire calendar year so calendar year information for 2013 should be available in December 2013.
20146,000.00Total tonnage calculated for an entire calendar year of effort and performance data was not available until mid to late December 2014
20153,800.00Total tonnage in calendar year 2015 placed on permitted Artificial Reef sites was 3,800.0 tons. This is less than the average of tonnage placed in 2013 and 2014 which is roughly 5,000 tons. Amount of tonnage placed overboard is affected by funding available for this work, the timing of the donations on which the program heavily relies and the availability of suitable reef material.
2016505.00The agency relies on donation or materials of opportunity. Due to changed scheduling by the agency's planned donors, much of the tonnage expected to be deployed on permitted Reef sites in calendar year 2016 is now expected to be deployed in calendar year 2017.
201710,325.00The increase in tonnage in 2017 is almost entirely due to the large amounts of material deployed from the construction at the Lesner Bridge; most of the material went to the Cabbage Patch Reef.
2018
2019