|
| Year | Result | Explanatory Note |
|---|
| 2005 | 200.00 | Data is only available on a yearly basis. |
| 2006 | 178.00 | Data is only available on a yearly basis. |
| 2007 | 199.00 | Data is only available on a yearly basis. |
| 2008 | 227.00 | Data is only available on a yearly basis. . |
| 2009 | 196.00 | Data is only available on a yearly basis. |
| 2010 | 151.00 | Data is only available on a yearly basis. |
| 2011 | 168.00 | Data is only available on a yearly basis. |
| 2012 | 182.00 | Data is only available on a yearly basis. |
| 2013 | 199.00 | The agency Surveying/Engineering Department feels that, on average, applications for Oyster Ground Leases should be fully processed within 270 days, but strives for shorter processing time if at all possible and this is demonstrated by the average processing time achieved for the last reporting cycle. |
| 2014 | 172.00 | The agency Surveying/Engineering Department feels that, on average, applications for Oyster Ground Leases should be fully processed within 270 days, but strives for shorter processing time if at all possible and this is demonstrated by the average processing time achieved for the last reporting cycle. |
| 2015 | 177.00 | This figure represents the average number of days between the date the application was entered into the oyster ground leasing system and the date the application was assigned to a leaseholder. The goal is 270 days and the department strives for shorter processing times. |
| 2016 | 154.00 | |
| 2017 | 212.00 | |
| 2018 | 181.00 | |
| 2019 | 190.00 | |