Administration | 194 | Department of General Services | Roof Renovation Project at DGS Virginia Distribution Center | $7,106,885 | $7,106,885 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | DVS Memorial & Education Center at the Virginia War Memorial Carillon | $4,754,053 | $4,754,053 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | East Capitol Campus Planning | $2,032,469 | $2,032,469 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Roof Renovation Project at DGS Office of Surplus Property Management | $3,114,721 | $3,114,721 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | New State Lab for DGS Division of Consolidated Laboratory Services & Virginia Department of Agriculture and Consumer Services | $384,215,064 | $15,368,603 | $368,846,461 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Lease Language-Only Amendment | | $0 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Construct new Supreme Court building | $390,164,000 | $44,720,000 | $345,444,000 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Replace Windows at DBHDS State Facilities | $16,151,000 | $16,151,000 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Replace Access Control and Security Systems at DBHDS State Facilities | $22,335,000 | $22,335,000 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Replace Fire Alarms at DBHDS Facilities | $10,232,000 | $10,232,000 | $0 | $0 | $0 | $0 | $0 |
Administration | 194 | Department of General Services | Renovate Eastern State Hospital | $18,900,000 | $18,900,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Fort Monroe Post Theatre - Renovation to Multi-use Facility | $10,409,054 | $10,409,054 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Supplemental Funding for the African Landing Memorial to Supplement the $6M SLFRF funding | $2,500,000 | $2,500,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Rehabilitation of Fort Monroe Contributing Building 14 | $965,000 | $965,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Parking Improvements to support private development for Marina and TRADOC adaptive reuse | $11,100,000 | $11,100,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Rehabilitation of Fort Monroe Contributing Building 63 | $1,793,000 | $1,793,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Design and Construction Funds for Utility Master Plan Phase 1B - Ingalls Road | $32,115,308 | $32,115,308 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Rehabilitation of Fort Monroe Contributing Building 62 | $1,793,000 | $1,793,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Construction Funds for Utility Master Plan Phase 1A - McNair Road | $30,514,479 | $30,514,479 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Rehabilitation of Fort Monroe Contributing Building 15 | $1,676,000 | $1,676,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Install security cameras on Fort Monroe to assist with law enforcement investigations | $450,000 | $450,000 | $0 | $0 | $0 | $0 | $0 |
Commerce and Trade | 360 | Fort Monroe Authority | Rehabilitation of Fort Monroe Contributing Building 19 | $812,000 | $812,000 | $0 | $0 | $0 | $0 | $0 |
Education | 218 | Virginia School for the Deaf and the Blind | Main Hall Renovation (Construction Phase) | $38,261,341 | $38,261,341 | $0 | $0 | $0 | $0 | $0 |
Education | 242 | Christopher Newport University | Improvements: Fume Hood and Pressurization Valves/Controls | $5,322,787 | $5,322,787 | $0 | $0 | $0 | $0 | $0 |
Education | 242 | Christopher Newport University | Replace Plant Operations Building | $45,697,779 | $45,697,779 | $0 | $0 | $0 | $0 | $0 |
Education | 204 | The College of William and Mary in Virginia | Renovate Dormitories | $5,000,000 | $5,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 204 | The College of William and Mary in Virginia | Improve Adair Hall | $16,600,000 | $16,600,000 | $0 | $0 | $0 | $0 | $0 |
Education | 204 | The College of William and Mary in Virginia | Renovate Ewell Hall | $30,000,000 | $30,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 241 | Richard Bland College | Maze Hall Renovation | $6,362,401 | $6,362,401 | $0 | $0 | $0 | $0 | $0 |
Education | 241 | Richard Bland College | Center for Experiential Learning and Student Success (CELSS) | $6,973,979 | $6,973,979 | $0 | $0 | $0 | $0 | $0 |
Education | 241 | Richard Bland College | New HVAC System- Statesman Hall | $1,331,654 | $1,331,654 | $0 | $0 | $0 | $0 | $0 |
Education | 268 | Virginia Institute of Marine Science | Construct Marine Operations Administration Complex | $18,134,683 | $18,134,683 | $0 | $0 | $0 | $0 | $0 |
Education | 268 | Virginia Institute of Marine Science | Construct New Fisheries Science Building | $60,218,809 | $60,218,809 | $0 | $0 | $0 | $0 | $0 |
Education | 268 | Virginia Institute of Marine Science | Replace Andrews Hall Roof | $2,036,312 | $2,036,312 | $0 | $0 | $0 | $0 | $0 |
Education | 247 | George Mason University | Construct Student Innovation Factory Building (Resubmission) | $37,000,000 | $37,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 247 | George Mason University | Construct Interdisciplinary Science & Engineering Building 1 (Resubmission) | $165,000,000 | $165,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 247 | George Mason University | Aggregated Critical Deferred Maintenance | $36,000,000 | $36,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 247 | George Mason University | Construct School of Business Building (Resubmission) | $165,000,000 | $165,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 247 | George Mason University | Construct Life Sciences and Engineering Building/ Renovate Bull Run Hall - Equipment | $9,040,000 | $9,040,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Renovate Moody Hall | $46,340,000 | $46,340,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | East Campus Infrastructure - Phase 3 | $28,710,000 | $28,710,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | College of Health and Behavioral Studies Expansion | $109,630,000 | $109,630,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Renovate and Expand Carrier Library - FF&E | $7,043,000 | $7,043,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Spotswood Hall Renovation | $23,820,000 | $23,820,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Renovate Godwin Hall | $40,480,000 | $40,480,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Renovate Johnston Hall | $26,820,000 | $26,820,000 | $0 | $0 | $0 | $0 | $0 |
Education | 216 | James Madison University | Blanket - Property Acquisition | $3,000,000 | $3,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Renovate Hiner Hall Classroom and Commons | $4,421,000 | $4,421,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Renovate Greenwood Library Building | $65,837,000 | $65,837,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Demolish Multiple Campus Buildings and Restore Sites | $1,470,000 | $1,470,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Replace Chambers Court Storm Water Drainage Piping | $751,000 | $751,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Replace Steam Distribution Systems To Four Campus Buildings | $4,267,000 | $4,267,000 | $0 | $0 | $0 | $0 | $0 |
Education | 214 | Longwood University | Replace Chillers in Four Campus Buildings | $4,957,000 | $4,957,000 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Construct Lab School Academy | $37,393,060 | $37,393,060 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Construct New Dining Facility/Replace Scott Dozier | $76,387,058 | $76,387,058 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Construct Residential Housing Phase II /Replace Rosa & West Cafe | $78,597,510 | $78,597,510 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Improve Campus Infrastructure | $14,064,327 | $14,064,327 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Construct Wellness, Health and Physical Education Center | $146,813,968 | $146,813,968 | $0 | $0 | $0 | $0 | $0 |
Education | 213 | Norfolk State University | Construct Living Learning Center and Dining Facility | $129,332,812 | $129,332,812 | $0 | $0 | $0 | $0 | $0 |
Education | 221 | Old Dominion University | Construct Engineering and Arts Building | $164,025,000 | $164,025,000 | $0 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Purchase of Multi-Use Building Adjacent to Campus | $18,500,000 | $18,500,000 | $0 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Renovate George Washington Hall | $51,819,000 | $51,819,000 | $0 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Construct New Police Station | $11,365,000 | $1,000,000 | $10,365,000 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Farmer Hall Renovation | $35,405,000 | $35,405,000 | $0 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Dahlgren Campus Phase II | $40,800,000 | $1,800,000 | $39,000,000 | $0 | $0 | $0 | $0 |
Education | 215 | University of Mary Washington | Renovate Simpson Library | $44,245,000 | $44,245,000 | $0 | $0 | $0 | $0 | $0 |
Education | 207 | University of Virginia | Construct Engineering Technology/Teaching Facility and Biomedical Engineering Building | $224,988,034 | $224,988,034 | $0 | $0 | $0 | $0 | $0 |
Education | 207 | University of Virginia | Physics FF&E | $5,200,000 | $5,200,000 | $0 | $0 | $0 | $0 | $0 |
Education | 207 | University of Virginia | Alderman Library Renewal FF&E | $10,677,000 | $10,677,000 | $0 | $0 | $0 | $0 | $0 |
Education | 207 | University of Virginia | Alderman Library Renewal Supplemental Funding | $11,300,491 | $11,300,491 | $0 | $0 | $0 | $0 | $0 |
Education | 207 | University of Virginia | Construct Center for the Arts | $314,980,719 | $314,980,719 | $0 | $0 | $0 | $0 | $0 |
Education | 246 | University of Virginia's College at Wise | Technology Classroom Building New Construction | $66,642,806 | $66,642,806 | $0 | $0 | $0 | $0 | $0 |
Education | 246 | University of Virginia's College at Wise | Renovate Darden Hall | $46,377,067 | $46,377,067 | $0 | $0 | $0 | $0 | $0 |
Education | 246 | University of Virginia's College at Wise | Renovate/Convert Wyllie Library FF&E | $1,589,000 | $1,589,000 | $0 | $0 | $0 | $0 | $0 |
Education | 236 | Virginia Commonwealth University | Construct Research Building | $400,000,000 | $400,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 236 | Virginia Commonwealth University | Construct Interdisciplinary Classroom and Laboratory Building | $201,205,837 | $201,205,837 | $0 | $0 | $0 | $0 | $0 |
Education | 236 | Virginia Commonwealth University | Construct New School of Dentistry | $415,276,126 | $415,276,126 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Academic Classroom Building (Phase II), Glenns and Warsaw Campuses, Rappahannock | $20,060,000 | $20,060,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct Regional Center for Transportation, Logistics, and Truck Driving, Tidewater CC | $79,437,000 | $79,437,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Taylor and Temple Buildings, Danville | $46,686,000 | $46,686,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct Academic Building for Emerging and Applied Technologies/Replace Princess Anne Building, Tidewater CC | $55,504,000 | $55,504,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate and Expand Fincastle Hall, Wytheville CC | $35,293,000 | $35,293,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate and Expand Rooker for Advanced Manufacturing and Credentialing Center, New River CC | $80,952,000 | $80,952,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Replace Buchanan and Tazewell Halls, Southwest Virginia CC | $54,000,000 | $54,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Brown Library, Virginia Western CC | $29,866,641 | $29,866,641 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct Skilled Trades Building, Chester Campus, Brightpoint CC | $39,987,176 | $39,987,176 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct New Health Sciences Center and Renovate Robb Hall, Mountain Empire CC | $44,300,000 | $44,300,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate A.L. Philpott Technical Center & MET Complex Building 1, Patrick and Henry CC | $57,518,000 | $57,518,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Franklin Campus, Paul D. Camp CC | $27,094,000 | $27,094,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Main Academic Builidng, Downtown Campus, J. Sargeant Reynolds CC | $42,000,000 | $42,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Wolk Hall, Fauquier Campus, Laurel Ridge CC | $34,555,000 | $34,555,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Stone Hall Building, Patrick and Henry CC | $27,976,000 | $27,976,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct Automotive Tech Building/Renovate Veterinary Tech Building, Blue Ridge CC | $18,570,000 | $18,570,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Learning Resource Center (LRC),Virginia Highlands CC | $21,000,000 | $21,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Main Building, Daniel Campus, Southside Virginia CC | $32,204,000 | $32,204,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Replace Walker Building, Norfolk Campus, Tidewater Community College | $88,142,000 | $88,142,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Roper Performance Arts Center, Norfolk Campus, Tidewater CC | $70,192,000 | $70,192,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Main Academic Building, Phase II, Piedmont Virginia | $32,483,000 | $32,483,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Replace Old Storage Building with New Warehouse, Central Virginia CC | $4,732,000 | $4,732,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Martin Building, Phase I, Norfolk Campus, Tidewater | $37,323,000 | $37,323,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate and Expand Nursing Building, Virginia Highlands Community College | $27,773,000 | $27,773,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Business Science Building, Enclosed Pedestrian Corridor and Bridge, Virginia Western | $29,600,000 | $29,600,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Houff Student Center, Blue Ridge | $15,118,000 | $15,118,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Reconstruct Campus Central Plant, Annandale Campus, Northern Virginia CC | $24,000,000 | $24,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Old National Guard Armory Building, Mountain Gateway CC | $29,223,000 | $29,223,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Construct Advanced Trades and Technology Building, Portsmouth Campus, Tidewater CC | $50,687,000 | $50,687,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Replace Engineering Academic Building, Alexandria Campus, Northern Virginia | $43,700,000 | $43,700,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Hastings Hall and Annex, Hampton Campus, Virginia Peninsula CC | $51,284,000 | $51,284,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Renovate Seefeldt Building, Woodbridge Campus, Northern Virginia | $4,410,000 | $4,410,000 | $0 | $0 | $0 | $0 | $0 |
Education | 260 | Virginia Community College System | Replace Diggs/Moore/Harrison Complex, Hampton, Thomas Nelson | $3,686,000 | $3,686,000 | $0 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Construct Moody Hall | $68,631,674 | $0 | $68,631,674 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Repair Barracks Windows and Doors (Old and New Barracks) | $36,703,158 | $0 | $36,703,158 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Improvement to Hinty Hall & Facilities Infrastructure | $22,429,128 | $2,877,632 | $19,551,496 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Improvements & Renovations to New Market Battlefield State Historic Park | $30,444,618 | $3,637,147 | $26,807,471 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Improve 307 & 309 Letcher Ave (Admissions & Financial Aid Offices) | $7,355,713 | $1,162,909 | $6,192,804 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Patchin Field Soccer & Lacrosse Stadium / Paulette Hall Renovation | $21,706,757 | $1,478,203 | $20,228,554 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Crozet Hall Renovation | $46,851,725 | $4,611,639 | $42,240,086 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Cocke Hall Annex Renovation | $7,768,640 | $1,072,754 | $6,695,886 | $0 | $0 | $0 | $0 |
Education | 211 | Virginia Military Institute | Construct Center for Leadership and Ethics Facility, Phase II | $89,853,804 | $0 | $89,853,804 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Renovate and Expand Chemistry/Physics Facilities | $141,400,000 | $141,400,000 | $0 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Address Life, Health, Safety, Accessibility and Code Compliance: Campus Accessibility | $8,000,000 | $8,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Financing for Building Envelope Improvements | $47,200,000 | $47,200,000 | $0 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Financing for Replace Randolph Hall | $29,600,000 | $29,600,000 | $0 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Repair Derring Hall Envelope | $16,830,000 | $16,830,000 | $0 | $0 | $0 | $0 | $0 |
Education | 208 | Virginia Polytechnic Institute and State University | Expand Virginia Tech-Carilion School of Medicine and Fralin Biomedical Research Institute | $183,700,000 | $183,700,000 | $0 | $0 | $0 | $0 | $0 |
Education | 229 | Virginia Cooperative Extension and Agricultural Experiment Station | Agricultural Research and Extension Center Improvements | $25,200,000 | $25,200,000 | $0 | $0 | $0 | $0 | $0 |
Education | 229 | Virginia Cooperative Extension and Agricultural Experiment Station | Improve Center Woods Complex | $14,700,000 | $14,700,000 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Renovate Virginia Hall | $68,936,529 | $68,936,529 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Improve Lifesafety Systems Campuswide | $19,177,680 | $19,177,680 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Renovate Davis Hall | $44,820,471 | $44,820,471 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Site Improvements to South Entrance for Code Compliance and Security | $7,402,140 | $7,402,140 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Renovation and Addition to Johnston Memorial Library | $76,036,699 | $76,036,699 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Construct BOLT Leadership Center for Social Responsibility | $70,566,517 | $70,566,517 | $0 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Construct New Student Housing | $56,396,662 | $34,641,042 | $21,755,620 | $0 | $0 | $0 | $0 |
Education | 212 | Virginia State University | Demolish/Replace Daniel Gym and Demolish Harris Hall FF&E | $9,792,597 | $9,792,597 | $0 | $0 | $0 | $0 | $0 |
Education | 234 | Cooperative Extension and Agricultural Research Services | Renovate the Wilder Cooperative Extension Building | $5,875,000 | $5,875,000 | $0 | $0 | $0 | $0 | $0 |
Education | 234 | Cooperative Extension and Agricultural Research Services | Renovate Summerseat for Urban Agriculture Center | $9,533,000 | $9,533,000 | $0 | $0 | $0 | $0 | $0 |
Education | 239 | Frontier Culture Museum of Virginia | Crossing Gallery | $1,000,000 | $1,000,000 | $0 | $0 | $0 | $0 | $0 |
Education | 417 | Gunston Hall | Gunston hall, New Visitor Center | $51,555,130 | $51,555,130 | $0 | $0 | $0 | $0 | $0 |
Education | 425 | Jamestown-Yorktown Foundation | Jamestown Walkways and Lighting | $1,995,649 | $1,995,649 | $0 | $0 | $0 | $0 | $0 |
Education | 425 | Jamestown-Yorktown Foundation | Renovate the Susan Constant | $4,712,381 | $4,712,381 | $0 | $0 | $0 | $0 | $0 |
Education | 425 | Jamestown-Yorktown Foundation | Jamestown Lobby Floor | $659,406 | $659,406 | $0 | $0 | $0 | $0 | $0 |
Education | 425 | Jamestown-Yorktown Foundation | Jamestown Settlement and ECSC Roof Replacement | $7,411,056 | $7,411,056 | $0 | $0 | $0 | $0 | $0 |
Education | 202 | The Library Of Virginia | Library Building Renovation | $65,849,354 | $2,968,642 | $62,880,712 | $0 | $0 | $0 | $0 |
Education | 146 | The Science Museum of Virginia | Refurbishment and Re-Allocation of Interior Space | $250,000 | $250,000 | $0 | $0 | $0 | $0 | $0 |
Education | 146 | The Science Museum of Virginia | Preserve and Maintain Historic Train Sheds and Tracks | $250,000 | $250,000 | $0 | $0 | $0 | $0 | $0 |
Education | 942 | Virginia Museum of Natural History | Early Childhood Learning Center | $2,027,832 | $2,027,832 | $0 | $0 | $0 | $0 | $0 |
Education | 942 | Virginia Museum of Natural History | Construct satellite facility in Waynesboro, Virginia | $41,226,628 | $41,226,628 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Umbrella Project - Security Improvements at DBHDS Facilities Statewide | $18,861,531 | $18,861,531 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Install Duress Systems at DBHDS Facilities, Statewide | $27,971,394 | $27,971,394 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Install Boilers at CSH Building 94 and Hiram W. Davis Medical Center | $7,526,000 | $7,526,000 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Hardening Buildings 1 & 2 ESH | $24,340,860 | $24,340,860 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Construct Maintenance/Warehouse Building, for Southeastern Virginia Training Center | $3,466,200 | $3,466,200 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Renovate Catawba Hospital – Planning Funds | $55,874,482 | $55,874,482 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Install First Responder Emergency Repeater Systems at DBHDS Facilities, Statewide | $6,386,500 | $6,386,500 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 720 | Department of Behavioral Health and Developmental Services | Make infrastructure repairs to state facilities | $6,000,000 | $6,000,000 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 203 | Wilson Workforce and Rehabilitation Center | WWRC STRUCTURAL REPAIRS OF BUILDINGS 802 AND 806 | $4,631,484 | $4,631,484 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 203 | Wilson Workforce and Rehabilitation Center | CONSTRUCT NEW PERT FACILITY TO REPLACE THE MARY SWITZER BUILDING | $53,209,590 | $53,209,590 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 702 | Department for the Blind and Vision Impaired | LRC - FFE Request | $750,000 | $750,000 | $0 | $0 | $0 | $0 | $0 |
Health and Human Resources | 702 | Department for the Blind and Vision Impaired | VIB-C Renovation FFE | $1,282,426 | $1,282,426 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | State Park Office and Retail Operations | $20,560,000 | $20,560,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Wilderness Road Development | $3,508,000 | $3,508,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Southeast Virginia Fire-managed Biodiversity Hotspot Protection | $9,900,000 | $9,900,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | C-50 and C-51 NGF Appropriation | $22,931,250 | $22,931,250 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Westmoreland State Park Erosion Response | $7,150,000 | $7,150,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critically Needed Natural Areas Stewardship Mountain Region Operations Center | $8,740,000 | $8,740,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Group I - State Park Interpretive Displays | $1,235,000 | $1,235,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | State Park Property Acquisitions | $12,450,000 | $12,450,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | York River State Park Phase II Campground | $5,860,000 | $5,860,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critical Songbird Habitat Acquisition and Restoration on the Eastern Shore | $1,300,000 | $1,300,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critical Overnight Support Facilities at Various State Parks | $6,985,000 | $6,985,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critical Visitor Contact Stations at Various State Parks | $6,600,000 | $6,600,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critical Expansions to Increase Resiliency and Resource Protection at Existing Natural Area Preserves | $8,550,000 | $8,550,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Pocahontas State Park Visitor Center/Education Center/Regional Support Center | $8,707,500 | $8,707,500 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Buffalo Mountain Resource Protection and Public Access Expansion | $3,500,000 | $3,500,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Group 2 - State Park Interpretive Displays | $2,840,000 | $2,840,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Southwest Virginia Cave and Karst Protection | $850,000 | $850,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Group 3 - State Park Educational and Interpretative Displays | $3,099,250 | $3,099,250 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Natural Bridge State Park Renovation and Repairs | $27,360,000 | $27,360,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Widewater State Park Camping and Cabin Facilities | $23,060,000 | $23,060,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | New Natural Area Preserves for Insufficiently Protected Natural Communities and Rare Species Habitats | $3,355,000 | $3,355,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | The Cedars Expansion, Recreational Access, and Habitat Restoration | $3,000,000 | $3,000,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Adjustments to C-51 Language | | | | | | | |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | State Park Climate Control in Yurts | $1,600,000 | $1,600,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Critical Maintenance Areas at Various State Parks | $11,200,000 | $11,200,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Adjustments to C-50 Language | | | | | | | |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Restoration of the James House at Mason Neck State Park | $6,373,000 | $6,373,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Underground Storage Tanks (UST) Replacement | $13,340,000 | $13,340,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Clinch River State Park - Phase IA Development | $23,790,000 | $23,790,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Expand and Enhance Outdoor Recreation Opportunities in Natural Area Preserves | $1,738,000 | $1,738,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Renovation or Replacement of Existing Revenue Generating Cabins at Hungry Mother State Park | $20,350,000 | $20,350,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Various Utility / ADA Furnishings and Equipment | $300,000 | $300,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Renovation or Replacement of Existing Revenue Generating Cabins | $14,130,000 | $14,130,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | New Revenue Generating Cabins at Various State Parks | $33,860,000 | $33,860,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 199 | Department of Conservation and Recreation | Continuation of Deferred Maintenance Backlog | $45,000,000 | $45,000,000 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 403 | Department of Wildlife Resources | Renovate Aquatics Wildlife Conservation Center | $9,516,129 | $9,516,129 | $0 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 403 | Department of Wildlife Resources | Renovate and Upgrade Wytheville Fish Hatchery | $8,000,416 | $0 | $8,000,416 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 403 | Department of Wildlife Resources | Acquire Land and Property | $10,000,000 | $5,000,000 | $5,000,000 | $0 | $0 | $0 | $0 |
Natural and Historic Resources | 423 | Department of Historic Resources | Clermont Barn | $1,300,000 | $1,300,000 | $0 | $0 | $0 | $0 | $0 |
Public Safety and Homeland Security | 799 | Department of Corrections | Farmville Probation and Parole Capital Lease Authorization | | | | | | | |